Electrical laboratory equipment premises. Electrical laboratory - electrical measuring work

The TM-Electro company is certified by the Federal State Unitary Enterprise Scientific and Technical Center "ENERGOBEZOPASNOST" and is a conformity assessment body

The price list is provided for reference. The final price is affected by the area of ​​the object and the distance. CALL NOW and get significant DISCOUNTS - our managers will individually calculate the cost of electrical laboratory services for you! You can order a free consultation with a specialist and a free visit of an engineer to the site.

Prices for acceptance and operational tests:

Object area (sq.m.)

Cost (RUB) RUB

Operational Acceptance and delivery documents
up to 25

4 500

7 500

26-100

7 500

12 500

101-200

12 500

17 500

201-500

17 500

24 500

501-1200

24 500

37 500

1201-2000

37 500

44 950

ETL tests carried out show the real state of the electrical installation, which allows the operation service to promptly identify problem areas. Properly performed measurements are the key to trouble-free and uninterrupted operation! Moreover, our prices are among the lowest in Moscow!

We will carry out professional testing by a licensed electrical laboratory

Laboratory tests must be carried out after completion, reconstruction or during operation of the electrical installation.

The results of the tests and measurements performed are entered into the Technical Report Protocols.

The technical report is compiled in accordance with the current Norms and Rules.

The list of defects contains the main defects of the electrical installation that need to be eliminated. (PTEEP clause 1.7.2. and PTEEP clause 3.6.24.)

Timely elimination of defects and comments increases the reliability of the electrical installation and operational safety. Warns of comments and instructions from regulatory authorities!

ETL TM-Electro guarantees:

  • Free visit to inspect and study the property
  • Quick calculation of the cost of electrical measuring work
  • Estimate during the day
  • Prices below market
  • Availability of all permits
  • Thermal imaging diagnostics of switchboard equipment - free of charge
  • To perform the work, we use modern equipment with annual verification. High-quality performance of work within the agreed time frame.
  • Engineers with permission to carry out measurement work
  • Experience of at least 10-15 years
  • Discount on repeat measurements up to 50%

The main tests are divided into:

  • Operational and acceptance
  • Tests of lightning protection devices can be carried out separately - usually performed annually before the start of the thunderstorm season and grounding resistance tests
  • In addition to testing, the Ministry of Emergency Situations and Rostechnador can check the presence of a grounding device passport
  • Operational tests are performed once every 3 years (once a year at particularly hazardous facilities)
  • Test frequency table
  • Acceptance tests are carried out after new electrical installation or reconstruction of the power supply system

Prices for electrical measuring work:

List of documentation of the Technical Report (operational tests):

  1. Explanatory note
  2. Protocol No. 1. Presence of a circuit between a grounded electrical installation and the installation’s grounding elements
  3. Protocol No. 2. Measuring the insulation resistance of wires and cables
  4. Protocol No. 3. Checking the agreement of the parameters of the “phase-zero” circuit with the characteristics of protection devices and the continuity of protective conductors
  5. List of defects

List of documentation of the Technical report (acceptance tests):

  1. List of technical documentation
  2. Object passport
  3. Test program
  4. Protocol No. 1. "Visual inspection"
  5. Protocol No. 2. “Protocol for the presence of a circuit between grounded electrical installations and elements of a grounded electrical installation”
  6. Protocol No. 3. “Protocol of insulation resistance of wires, cables, windings of electrical machines and devices”
  7. Protocol No. 4. “Protocol for checking the coordination of the parameters of the phase-zero circuit with the characteristics of overcurrent protection devices”
  8. Protocol No. 5. “Protocol for testing circuit breakers with voltages up to 1000 V”
  9. Protocol No. 6. “Inspection and testing protocol for automatic circuit breakers controlled by differential current (RCD)”
  10. List of defects
  11. Conclusion

The TM-Electro company is represented on the Moscow supplier portal. The portal is intended for participants in the placement of government orders as part of “small volume” procurement (clause 14, 14.1, part 2, article 55 of the Federal Law of July 21, 2005 94-FZ)

To conclude government contracts for work related to operational tests and acceptance tests, you must enter the Offers section. Enter the company name: TM-Electro.

Permits:

  • “Certificate of registration of an electrical laboratory” No. 6428 dated 06/03/2016.
  • “Certificate of Attestation No. IL - 00021”
  • “Certificate of Conformity No. SMK.RU/08/09/-1658”
  • “Qualification certificate dated May 15, 2008, series AA, No. 0000035”

Certificate of registration of the electrical laboratory IC "TM-Electro" (PDF).

List of permitted species testing and measurement electrical laboratory:

  1. Checking the condition of elements of grounding devices of electrical installations
  2. Checking the presence of a circuit and measuring resistance between grounding conductors and grounded conductors, grounded equipment (elements) and grounding conductors
  3. Earth resistivity measurement
  4. Measurement of resistance of grounding devices of all types. In this case, the measurement establishes compliance of the results obtained with the requirements of the PUE
  5. Measuring the resistance of the phase-zero loop in installations with voltages up to 1 kV with a solidly grounded neutral. This resistance measurement allows you to determine the possibility of operation of the protection device (differential circuit breaker or conventional circuit breaker) when a single-phase short circuit occurs. This check reveals possible errors in the power supply network, and in particular the stages of selecting switching equipment and cross-section of cable lines
  6. Measurement of insulation resistance of cables, windings of electric motors, devices, secondary circuits and electrical wiring, electrical equipment with voltage up to 1 kV. In this case, the measurement is carried out with a megger with a test voltage of 1000 or 2500, depending on what part of the electrical installation is being tested at the moment
  7. The measured resistance should not exceed the values ​​established in the relevant sections of the PUE. Checking the protection operation in a power system with a grounded isolated neutral. Inspection and testing of automatic installation machines of supply lines and RCDs
  8. Checking the operation of protection provided by fuse-links in electrical installations up to 1 kV, calibration of fuse-links
  9. Testing circuit breakers in electrical networks with voltages up to 1 kV for current operation
  10. Measurement of transition contacts and winding resistances of electrical machines and transformers
  11. Measurement of DC resistance of windings of power transformers and oil circuit breakers
  12. High voltage testing of cable lines and electrical equipment with voltage up to 1 kV
  13. Testing and measuring the characteristics of voltage transformers and current transformers with voltages up to 1 kV
  14. Checking relay protection devices, automation and telemechanics
  15. Checking emergency lighting circuits
  16. Measuring the current spreading resistance of a grounding device
  17. Checking lightning protection schemes
  18. Inspection and testing of power supplies

Electrolaboratory - best prices for services in Moscow and Moscow Region

One of the main conditions for stable operation of the power supply system is its regular maintenance and carrying out all necessary electrical measurements. It is for these purposes that there is a mobile electrical measuring laboratory, which promptly and fully carries out all acceptance and operational measurements regulated by regulatory documentation. Under the term " mobile electrical laboratory"should be understood as a company licensed to service and measure electrical equipment and power supply networks. Such mandatory checks include measuring the insulation resistance of cable lines, checking the grounding and working grounding of the building, etc.

The Electrical Laboratory (ETL) carries out both one-time and periodic (defined by regulatory documents) targeted and complex tests of grounding devices (including measuring the insulation resistance of wires, checking the integrity of the grounding circuit, checking the operation of the protection and measuring the resistance to the spreading of the ground loop current) and lightning protection , ringing of cables, equipment and much more on a contractual basis.

Based on the test results, a standard standard protocol is issued and, in case of detection of malfunctions, a defective statement is issued..

The activities of the electrical laboratory are 100% licensed

All necessary compliances, requirements and standards are observed. The devices used are verified and certified by the State Metrological Service.

We conduct personnel certification and training. Issue of admission group up to IV inclusive. Including access to laboratory tests.

In what cases is it necessary to carry out electrical measurements and tests of an electrical installation:

  • new and completely renovated apartments
  • cottages, country houses, country houses and other buildings
  • garages, sheds or any other premises
  • input measurement, often recommended by inspectors
  • moving the meter in the apartment to another place or moving the electrical panel from the floor to the living space
  • heated floors and various electrical equipment
  • obtaining additional power transfer of premises to non-residential stock or property
  • fire safety considerations and more

Based on the test results of the electrical laboratory, a standard technical report is issued of an established standard, consisting of the required number of protocols, depending on the characteristics of a particular object and, in case of detection of violations, a defective statement. The frequency of testing is determined by regulatory documents.

Each protocol is certified by a seal. At the end of the protocol a conclusion is given. The technical report must be accompanied by an explanatory note, certified photocopies of the license and registration certificate. Modern plastic binding makes the report pleasant to look at, easy to handle and durable during storage.

A typical electrical laboratory protocol consists of:

  • title page, with the logo and details of the electrical control laboratory, indicating the name of the organization, the full address of the customer and the date of measurements
  • explanatory note describing in detail the method and progress of measurements
  • the first protocol is a visual inspection of the electrical installation for its compliance with PUE, SNiPs and electrical installation standards
  • the second protocol is the presence of a metal connection - a continuous circuit between equipment requiring grounding and the building’s grounding loop
  • the third protocol is the result of testing the insulation resistance of the tested wires and cables using a megohmmeter
  • the fourth protocol reflects the results of measuring the phase-zero loop, or the short circuit current required for emergency operation of the electromagnetic or thermal splitter of the machine or burnout of the fuse link
  • the fifth protocol reflects the state and parameters of the ground loop, if, of course, you have one
  • a copy of the registration certificate of the laboratory approved for operation

Each protocol is certified with the round seal of the electrical laboratory. At the end of the protocol a conclusion is given. Modern plastic binding makes the report pleasant to look at, easy to handle and durable during storage.

All Technical Reports are prepared in accordance with the PUE, PTEEP, Norms and Rules. Complies with the requirements of Rostechnadzor and the Ministry of Emergency Situations

Electrical laboratory TM-Electro will quickly and efficiently carry out electrical measurements

We will promptly answer all your questions and calculate the work estimate. If you are scheduled for an inspection, an order has been issued, the deadline for the Technical Report has passed. We will perform acceptance, operational or preventive tests.

Electrical measurements are carried out by qualified employees using modern electronic equipment that has undergone annual verification.

Loop phase zero. From these Technical Report protocols, the current state of the electrical installation can be determined. The TM-Electro electrical laboratory performs all measuring work only on site. If a shutdown is necessary, the shutdown schedule is agreed upon with the Customer.

TM-Electro does not issue a Technical Report without an on-site visit. Over more than 13 years of work, we have accumulated vast practical experience in carrying out electrical measuring work (measuring insulation resistance, measuring phase zero loops). Resistance measurement is one of the most popular Technical Report protocols.

Using digital instruments, the integrity of the insulation of cable lines is checked. Instrument readings are compared with reference standards and recorded in a report in the form of a table. The table also indicates the marking of cable lines and cross-section. In the last column it is written whether the insulation complies or does not comply with the standard.

In case of non-compliance, the remark is included in the List of Defects and is subject to elimination. Measuring insulation resistance allows you to identify a problem before an emergency occurs.

Poor insulation is the main cause of short circuits, fires and electric shocks..

The photo below shows examples of dangerous situations with electrical equipment from the practice of our ETL. Complete burning of the insulation of the electrical wire and the body of the circuit breaker (in a wooden house!).

Attention! Often, dangerous electrical installation faults cannot be identified by visual inspection.

Measurements are carried out in accordance with the test frequency table or at the request of the person responsible for electrical equipment (after all, he is responsible for the safety of the facility). To measure resistance, the time-tested Sonel MIC 250 device is usually used. We will promptly answer all your questions and calculate the cost estimate.

We also work throughout Moscow and in the following cities of the Moscow region:

Balashikha, Khimki, Podolsk, Korolev, Lyubertsy, Mytishchi, Elektrostal, Zheleznodorozhny, Kolomna, Odintsovo, Krasnogorsk, Serpukhov, Orekhovo-Zuevo, Shchelkovo, Domodedovo, Zhukovsky, Sergiev Posad, Pushkino, Ramenskoye, Noginsk.

Mobile electrical laboratories ETL, IEC of domestic production were assembled by specialists of Pergam-Engineering JSC and equipped with BAUR, Megger, Radiodetection equipment. Designed for testing and diagnostics of electrical equipment of substations, switchgears and cable lines, measuring the insulation resistance of power and current transformers, high-voltage switches and relay protection. They are used to determine the location of faults in cable lines using precise and preliminary location methods.

Mobile electrical laboratories MEK, ETL are produced on the basis of Mercedes Benz, Sprinter, Volkswagen LT35, Ford Transit, GAZ-27057, KAMAZ-43118, KAMAZ-43114, URAL-4320, GAZ-33081 vehicles. The laboratory van body is of frame construction (or made of sandwich panels on a welded frame), thermally insulated, manufactured in a two-compartment design. For finishing we use high-quality plastic that does not crack in the cold. The price of an electrical laboratory is calculated individually and depends on the equipment and chassis of the vehicle.

Equipment and certification

Each Pergam™ electrical laboratory is certified and registered with the State Traffic Safety Inspectorate. We will help you obtain a certificate of registration of an electrical laboratory in Rostechnadzor. We will train your specialists in the rules of working in electrical laboratories and how to use the equipment correctly. Services: we provide warranty and post-warranty maintenance of laboratories and equipment. Electrical laboratories are equipped in Europe and Russia.

Advantages of electrical engineering laboratories PERGAM

  1. Simplicity and ease of operation of both individual components and the electrical laboratory as a whole;
  2. Five degrees of safety against electric shock;
  3. A wide range of equipment makes it possible to complete electrical laboratories with an optimal price/functionality ratio;
  4. The assembly of electrical laboratories is carried out both on the territory of Russia (Moscow and Nizhny Novgorod) and the CIS (Kyiv), and on the territory of the equipment manufacturer (England, Austria and Switzerland);
  5. Fully Russified interface;
  6. Availability of unique equipment for testing cable lines at ultra-low frequencies, which does not damage the insulation. Training of customer specialists is carried out both on the customer’s territory and on the territory of the equipment manufacturer;
  7. Warranty and post-warranty maintenance of laboratories. ETL mobile electrical laboratories are designed for testing and diagnostics of cable lines and substation equipment;
  8. Mobile diagnostic systems have completed documents for registration with the State Traffic Safety Inspectorate and a vehicle type approval certificate.
  9. Laboratories allow you to measure insulation resistance: measuring the insulation resistance of cable lines, measuring the impedance of the phase-zero circuit, checking circuit breakers and the presence of a circuit between grounding switches and grounded elements, checking the grounding loop, determining soil resistivity, etc.

This is a mandatory procedure for the consumer of electricity, which is controlled by the bodies of the “Federal Service for Environmental, Technological and Nuclear Supervision (ROSTEKHNADZOR)” and the “Ministry of the Russian Federation for Civil Defense, Emergency Situations and Disaster Relief (EMERCOM of Russia)”. The frequency of such tests is regulated by PTEEP, PUE, “Inter-industry rules for labor protection in retail trade”, “GOST R 50571.28-2006 (IEC 60364-7-710:2002) Electrical installations of medical premises”, “Inter-industry rules for labor protection during the operation of oil depots, fuel and lubricants warehouses, stationary and mobile gas stations.”

    Electrical distribution networks of premises, protection devices, electrical installations, etc. indoors
    without increased danger

    at least once every 3 years

    Fulfillment of technical conditions for the implementation of technological connection.

    Commissioning of electrical installations.

    a) Accompaniment of a representative of cable networks for compliance with the Technical Specifications with subsequent approval of the Act on the delimitation of balance sheet ownership and operational responsibilities of the parties (ARBP);
    b) Collection of permitting documentation in the grid companies of OJSC "MOESK" / OJSC "UEK";
    c) Filling out an application to call the state inspector of MTU Rostekhnadzor and also obtaining an Inspection Certificate and Permit for Admission to Operation of Electrical Installations;
    d) Execution of the Contract for power supply of Mosenergosbyt OJSC.
    e) Supply voltage.
    a) Approval of documentation in grid companies JSC MOESK/JSC
    “OEC” at the stage of submitting applications with the assignment of an individual tariff;
    b) Collection and preparation of documents for the subject and application:
    from 15-150 kW, 150-670 kW over 670 kW over 8900 kW;
    c) Collection and preparation of documents for the purpose of filing an application for Technological connection through power redistribution;

All work must be carried out by qualified specialists who have the appropriate level of electrical safety clearance with the right to test equipment at high voltage. The company must also be certified by ROSTEKHNADZOR. And we are ready to provide all Electrolaboratory services, efficiently, quickly and at affordable prices.

Many people are interested in the functions of an electrical measuring laboratory and its main tasks. Some believe that using such a laboratory results in additional costs and provides virtually no benefit. In fact, this is not the case, since the electrical measuring laboratory performs various tasks without which no enterprise can do.

The main tasks of the electrical laboratory:

  • insulation resistance measurement;
  • checking the presence of a circuit between grounded installations and elements of a grounded installation (measurement of cable insulation resistance);
  • checking the consistency of the parameters of the "Phase-zero" circuit with the characteristics of the protection devices (checking the resistance of the phase-zero loop);
  • checking the resistance of grounding conductors and grounding devices (measuring grounding resistance);
  • measuring the insulation resistance of cable lines with a megohmmeter;
  • comprehensive testing of electrical equipment;
  • checking the performance of the RCD when leakage currents occur in the protected line (measuring the RCD);
  • checking the functionality of circuit breakers.

One of the main services of our company is electrical measuring work. We monitor and test electrical equipment and power networks of various capacities. Using modern equipment, insulation resistance measurements and phase zero loop measurements are carried out. The use of modern high-precision instruments will make it possible to reliably and efficiently determine the level of safety of electrical installations and the compliance of their operating parameters with current technical documents. Our laboratory operates taking into account all the requirements imposed by the inspecting authorities. Today, all functioning electrical equipment must undergo mandatory testing, which includes measuring grounding resistance, checking the consistency of the parameters of the “Phase-zero” circuit with the characteristics of protection devices and measuring insulation.

An important advantage of our company is its extensive experience working with various enterprises and organizations. Therefore, the quality of electrical measuring work is at a very high level. All services, such as checking insulation resistance or measuring the resistance of the ground loop, are completed strictly within the specified time frame. The laboratory for electrical measurements, which is used by our company, is registered with the relevant supervisory authorities. Thanks to this registration, our company can carry out electrical measuring work on electrical equipment whose power exceeds 10,000 V.

Using an electrical measuring laboratory, you can carry out various types of measurements related to the operation of electrical equipment:

  • Tests regulated by energy regulatory authorities.
  • Regular measurements necessary to prevent emergencies and various technical problems.

After taking measurements, the company’s specialists provide the customer with a comprehensive report, which is used when checking the operation of electrical equipment. If, during the measurement of insulation resistance or other measurements, any violations or defects were identified, then our specialists will draw up a statement with these defective data. It is an important accompanying document when working with electrical installations.

One of the functions of the electrical measuring laboratory is to measure the insulation resistance in electrical wiring, electrical equipment and secondary circuits. Our equipment can work with circuits with voltages over 1 kV. The main indicator used to determine the level of insulation reliability is the resistance in the system insulation. In addition, the phase zero loop is evaluated. All tests and measurements in our laboratory are carried out taking into account certain requirements regulated by regulatory authorities.

Electrical Engineering Laboratory. High-voltage stationary laboratory for testing protective equipment and electrical equipment. LEIS

Requirements for premises for the laboratory.

1. Presence of a ground loop in the high-voltage compartment.
2. Electrical input 380, V 15 A.
3. Availability of exhaust ventilation (if it is absent, it is possible to organize an exhaust ventilation through the window).
4. It is desirable to have water supply and sewerage outside the high-voltage compartment.
5. The layout of the laboratory equipment at the Customer’s premises is agreed upon at the stage of approving technical specifications for the laboratory. Below are possible options for locating the LEIS laboratory.

Laboratory equipment placement options

Option #1.

1. Power input stand.

3. Test bench for voltage indicators
4. Drying stand for protective equipment
5. High voltage transformers
6. Door with locks to the high-voltage compartment
7. Electromagnetic protective shield
8. Table for spare parts (spare parts, tools, accessories)
9. Ground loop

Option #2.

1. Stand for processing results from a PC.
2. Door with interlocks to the high-voltage compartment.
3. Power input stand.
4. Test stand for protective equipment made of dielectric rubber and tools.
5. Drying stand for protective equipment.
6. Fume hood with the Tangent 3M device.
7. Fume hood with the SKAT-M100 device.
8. High voltage transformer 15 kV.
9. High voltage transformer 100 kV.
10. Test bench for insulating rods.
11. Rack h=2m for storing tested protective equipment.
12. Power input 3 ph. 16 A.
13. Electromagnetic protective shield.

Option #3.

1. Power input stand.
2. Test bench for protective equipment made of dielectric rubber and tools


5. Exhaust hood SHV-01-MSK
6. Exhaust hood SHV-01-MSK
7. High voltage transformer 15kV
8. High voltage transformer 50kV
9. Digital apparatus for testing transformer oil AIM-90TS
10. Installation for quality control of transformer oil AST-2M
11. Door with locks to the high-voltage compartment.

Option number 4.

1. Power input stand
2. Door with interlocks to the high-voltage compartment
3. Test stand for protective equipment made of dielectric rubber and tools
4. Drying stand for protective equipment
5. High voltage transformer 15 kV
6. High voltage transformer 50 kV
7. Test bench for insulating rods
8. Electromagnetic protective shield
9. Ground loop

Option #5.

1. Power input stand
2. Test bench for protective equipment from dielectric rubber and tools
3. Drying stand for protective equipment
4. Test bench for insulating rods
5. Table for spare parts (spare parts, tools, accessories)
6.-7. High voltage transformers 15 kV, 50 kV
8.-9.-.10. Fume hoods SHV-01-MSK
11. Door with interlocks to the high-voltage compartment
12.-13. Transformer oil testing apparatus AIM-90TS, installation for transformer oil control AST-2M